
10
nail into place. Run the Pipe Sections through the hole in the Bucket Support,
connect the Dura-Connect Single Wall Connector, and attach the Clamp so
that it rests inside the Bucket, and will
support the Pipe. Adjust the Pipe to the
desired height and tighten the Clamp.
This will provide a complete engi-
neered support system.
COMBINATION TOP
1. Description. The Combination
Top, provides an easily installed, safe
and efficient B-Vent Top and Flashing,
as one lightweight unit. The two basic
components and the assembled unit are
shown in Figure 15. The Combination
Top is designed to accommodate roof
pitches from flat to 6/12, and is avail-
able for 3" through 6" diameter B-Vent
pipe.
2. Location. Locate the point in the
underside of the roof where the system
is to penetrate, using a plumb bob or
level.
3. Hole. Remove sufficient roofing
material to cut a hole in the roof which
will allow a minimum of 1 inch air
space between the B-Vent and com-
bustible roofing materials.
4. Flashing. Position the Flash-
ing so the hole is directly over the end
of the pipe, as shown in Figure 16.
Run the top edge of the Flashing under
the roof covering, nail as required,
Fig 15
1" MINIMUM
Fig 16
Fig 17
APPLY SEALANT
ALONG TOP, LEFT,
AND RIGHT EDGES,
AND ON NAIL
HEADS
RUN TABS ON
FLASHING UP
THRU RAISED
SLOTS ON CONE
Fig 18
AND THEN
FOLD THEM
OVER TO
HOLD CONE
TO FLASHING
1-1/2 TO 3
INCHES
Comentarios a estos manuales